Latest
Case Studies & News
Updates from our Aurangabad works — recent dispatches of boilers, SCAPH, WHRB and fabricated equipment for industrial projects across India.
SCAPH flash-steam air preheat for a tyre plant
Spent flash steam in a Grandeh SCAPH preheats combustion air at a tyre plant, cutting coal use in the boiler.
Read more →
Industrial process biomass fired package boiler for AAC Block
1.5 TPH biomass / wood-fired package boiler dispatched for an AAC block plant in Chhatrapati Sambhajinagar.
Read more →
Steam blowing box / WHRB for steel plant
Steam blowing box for slag granulation plus WHRB pressure parts for steel-plant heat recovery.
Read more →
Dampers for steel plants
Air and dilution dampers delivered to a major steel plant — BV-inspected before dispatch.
Read more →
Steam Coil Air PreHeater (SCAPH) for distillery
SCAPH coils dispatched for process / distillery boiler air preheating — G-type finned tubes for fouling-prone service.
Read more →Have a dispatch to share? Send photos and project details to contact@grandeh.com.
